Sunday, March 7, 2010

Nokia Symbian Foundation

Nokia Symbian Foundation
Industry:Software | Company Type:Foreign Company / Rep. Office | Company Size:1000+
Company Profile:Symbian is known as the Symbian OS, the market-leading open operating system for smart phones. Symbian OS is now a prefer OS for the main current smart phone vendors, like Nokia(S60).
2008-7 - Now Senior SW EngineerLocation:Beijing | Job Type:Full-time | Department: | Report to: | Number of Subordinates:employees | monthly salary:18000RMB
Job Category:Senior Software EngineerCareer Level:Senior Position (Non-managerial)
Responsibilities and Achievements:
As a SW engineer, I focus on the MTP technology research and MTP data provider development. MTP is a leading industry technology used to transfer media data from devices like cameras, smartphones to PC, or reversely. MTP component is a middle ware component in Symbian OS.
1. Lead the pictBridge dataprovider development (2009.5~now). This PREQ is to develop a new dataprovider to MTP subsystem, and to bring into the mobile phone a new pictBridge functionality. PictBridge is a technology used by digital devices like camera, mobile phone to print captured pictures when directly connected to a printer, no need PC anymore. In this PREQ, I lead a 3 people team, and responsible for the schedule plan and management, scope management, writing design sketch document, test plan, coding. And act as a communication window to image printing UI component.
2. Join a MTP component maintenance PREQ(2009.2~2009.5), enable MTP component to support files larger than 2G bytes. The legacy MTP component supports only files less than 2G bytes, however, as SD card capacity of phones is much larger than years ago, phones are more often used to store large size files, for example video files. This PREQ is to adapt MTP component to a new file systems, and enable MTP to support files with size reach 16 Exabyte. This PREQ has been delivered to product now.cheap polo shirts
3. Lead a Dataprovider Installation PREQ (2008.10~2009.2). The PREQ is aimed to adapt the MTP component to support loading the user installed MTP dataproviders. As the PREQ owner, I am responsible for the design sketch document, component design document, coding, and responsible for the quality of deliverables. And responsible for clarifying security issues or other challenges from senior technology management team. This PREQ has been delivered to product now. In this PREQ, I am the lead of 2 members team.
4. As a MTP transition team member, I co-worked with Symbian India engineers to setup the MTP ONB test environment in Beijing site (2008.7~2008.10).
McWiLL telecom technology corp.
Industry:Telecommunications (Equipment/Operation/Value-Added Service) | Company Type:Foreign Company / Rep. Office | Company Size:100 - 499
Company Profile:McWill (Multi-carrier Wireless information Local Loop) is a Chinese-developed mobile broadband wireless access standard, optimised for extremely wide area coverage, which is being deployed for the 2008 Beijing Olympics.
McWill is on show at the Olympic Games in Beijing 2008, and is used in Qingdao for Olympic sailing events and on a lake in the Shunyi suburb of Beijing for the Olympic rowing contest.
2005-2 - 2008-7 Development lead
Location:Beijing | Job Type:Full-time | Department:3rd Software Depart | Report to:Line Manager | Number of Subordinates:5employees | :
Job Category:Technical Director/ManagerCareer Level:management ( manager / director)Responsibilities and Achievements:Feb. 2005~July 2008, act as the development lead of layer 3 DataService team, I am responsible for the development of the layer3 DataService function, one of the two major functionalities in layer 3 subsystem of McWill product.
1. Data service feature development(2005.2~2007.5).
To develop the feature form beginning, a) I took part in the feature scope analysis, customer requirement collection and analysis, scope definition and confirmation; b)responsible for team member design and recruitment, feature high level design, interface design, task architecture design; c)and responsible for the risk evaluation and quality assurance; responsible for the choosing of test strategy, design of test tools and its maintenance, improvement and training as well.
2. Product maintenance and system optimization(2007.5~2008.7)
a)After McWill is on customer trials. I took part in the support team to help customer to deploy the McWill system, to configure McWill to co-work with customer existing network equipments.
b)Manage customer defectsralph lauren polo shirts
Huawei technologyIndustry: | Company Type:Private Company | Company Size:1000+Company Profile:2002-4 - 2005-1 (Sr.) software engineerLocation:beijing | Job Type:Full-time | Department: | Report to: | Number of Subordinates:employees | :
Job Category:Career Level:Responsibilities and Achievements:
1. An OAM project of GGSN/PDSN
--Responsible for SW maintenance and development of the SW loader, warning module, log and patch module. As well as sought, analysed and fixed SW system bugs.
--As a role of metric coordinator, keeping in touch with PM and QA, to help manage the project.
2. A data service project, development of a DHCP client for GGSN/PDSN
--Responsible for the SW requirement analysis, HLD/LLD docs, coding and test processes.
--Responsible for requirement analysis of the MPPC compress method, chosen of the implementation method.
--Responsible for a mini project, developing the corresponding SW for a new flexible card feature.
3. GGSN/PDSN system support team
cheap ralph lauren polo shirts
--Responsible for the R&D support of the GGSN/PDSN test and trials or commercial network running in customer sites.
--Technical support to other departments, incl. after-sale service, technical support. Gave proposal of networking solution, and so on.

No comments:

Post a Comment